Skip to content
FLANGES & FITTINGS MANUFACTURING · STEEL PIPE SUPPLYinfo@lkpiping.com

LEKE PIPING / QUALITY & INSPECTION

Quality & Inspection

Review material traceability, dimensional checks and inspection documents with your RFQ. Third-party inspection can be arranged on request or coordinated with your nominated agency; the scope is agreed for each order.

AGREE THE REQUIREMENTS

Define the Inspection Scope Before Ordering

01

Material requirements

Specify the material standard, grade and certificate type. Confirm how product markings and heat or batch numbers will link each item to its material records.

02

Dimensional checks

Identify the approved drawing revision, critical dimensions, tolerances and mating connection. Agree the inspection quantity or sampling plan and required measurement records.

03

Inspection documents

Send the inspection and test plan, required reports and buyer approval requirements. Identify witness or hold points and the notice needed by your inspector.

DOCUMENTATION

Inspection records and documents to confirm

ParameterDetails to confirm
Material recordsSpecify certificate type and the required link between product identification, heat or batch numbers and material records
Dimensional recordsIdentify dimensions, tolerances, inspection quantity or sampling plan, and required measurement records
Special testingState test methods, applicable standards, acceptance criteria, test extent and required reports
Third-party inspectionProvide agency details, inspection stages, witness or hold points, and advance notice requirements
Marking and packingConfirm product markings, traceability identifiers, surface protection, packing and packing-list requirements

ORDER REVIEW

Standard QA & Project-Specific Testing

Every quotation and order confirmation clearly specifies the inspection scope, testing standards, and required documentation.

Standard orders include dimensional checks, PMI verification, and EN 10204 3.1 MTCs; project-specific NDT (UT/RT/MT/PT) and third-party witness inspections by SGS, BV, or TÜV are scheduled directly into your production plan.

SEND YOUR REQUIREMENT

From your specification
to a clearer quotation

Send your product list, specifications, or approval drawings—our technical sales team will review the details and return an itemized quote within 24 hours.

USEFUL TO INCLUDE
  • Product, material and governing specification
  • Testing method, scope and acceptance criteria
  • Witness or third-party inspection requirements
  • Required certificates, reports and marking

You do not need every specification finalized before reaching out—send what you have and we will confirm the rest with you.